PUBLIC WORKS DIVISION

GuangZhou Subway Line 4 Tender 5 Project

Source: Views: Time:2018.03.09


Guangzhou subway line 4 tender 5 project is constructed by China Railway Tunnel Stock Co. under China Railway Tunnel Group. The diameter for tunneling is 11.98m. The stratum materials include gravelly soil, clay, gravel, weathered rock, etc. Slurry cycling volume is 1600m³/h. Two sets of MTP-800 slurry treatment system.