Home > References > PUBLIC WORKS DIVISION
SOME REFERENCES
  • ShanTou Suai Passage Project

    Shantou Suai Passage project, undertaken by China Railway Tunnel Co., Ltd. Six sets of MTP-1000 slurry separation plant and one set of ZTJ-200 slurrying and adjusting system are used.

  • XuZhou Subway Line 2 (The First Stage) Tender 10 Project

    Xuzhou subway line 2 (the first stage) tender 10 project. The stratum materials include silty clay, clay,weathered conglomerate, weathered siltstone, etc. one set of MTP-1000 slurry treatment system, one set of ZTJ-120 slurrying and adjusting system and one unit of APN18SL40M filter press, and one unit of APN15H-M60M filter press are employed

  • Xi’an City Subway Line 1 (The Second Stage) Tender D1aTJSG-2 Project

    Xi’an city subway line 1 (the second stage) tender D1aTJSG-2 project. The tunneling diameter is 6.28m.The stratum materials include slurry sand, stone, etc. one set of MTP-1000 slurry treatment system, one set of NJ-100 slurry circulatory system and one unit of APN18SL24M filter press are employed in this project.

  • Harbin Line 2 Tender 4 Project

    Harbin line 2 tender 4 project is constructed by China Railway 12th Bureau Group Co. limited. The tunneling diameter is 6.5m.The stratum materials include slurrydy clay, medium sand, fine sand, etc. Two sets of MTP-1000 slurry treatment system, one set of ZTJ-200 slurrying and adjusting system and one unit of APN18SL40M filter press are employed in this project

  • GuangZhou Subway Line 8 Project

    Guangzhou subway line 8 project. The tunneling diameter is 6.28m.The stratum materials include silty clay, slurrydy clay, sand, etc. Slurry cycling volume is 2000m³/h Two sets of MTP-1000 slurry treatment system, one set of ZTJ-120 slurrying and adjusting system and one unit of APN18SL80M filter press are employed in this project.

  • FuZhou Subway Line 2 Tender 4 Project

    Fuzhou subway line 2 tender 4 project. The stratum materials include medium-coarse sand, clay, gravel, etc. Slurry cycling volume is 1600m³/h. Two sets of MTP-800 slurry treatment system, two sets of ZTJ-120 slurrying and adjusting system and two units of APN18SL40Mfilter press are employed in this project.

  • GuangZhou Subway Line 4 Tender 5 Project

    Guangzhou subway line 4 tender 5 project is constructed by China Railway Tunnel Stock Co. under China Railway Tunnel Group. The diameter for tunneling is 11.98m. The stratum materials include gravelly soil, clay, gravel, weathered rock, etc. Slurry cycling volume is 1600m³/h. Two sets of MTP-800 slurry treatment system.

  • NanChang Subway Line 2 Tender 4 Project

    Nanchang subway line 2 tender 4 project is constructed by China Railway Tunnel Group Division 2 Limited Ltd. The diameter for tunneling is 6.28m. The stratum materials include intense-weathered slurrystone, medium-coarse sand, gravel, etc. Slurry cycling volume is 2000m³/h. Two sets of MTP-1000 slurry treatment system are employed in this project.