PUBLIC WORKS DIVISION
Harbin Line 2 Tender 4 Project
Views: Time:2018.03.09
Harbin line 2 tender 4 project is constructed by China Railway 12th Bureau Group Co. limited. The tunneling diameter is 6.5m.The stratum materials include slurrydy clay, medium sand, fine sand, etc. Two sets of MTP-1000 slurry treatment system, one set of ZTJ-200 slurrying and adjusting system and one unit of APN18SL40M filter press are employed in this project.