SOME REFERENCES
  • NanNing Subway Line 1 Tender 11 Project

    Nanning subway line 1 tender 11 project is constructed by China Railway Tunnel Limited by Share Ltd. The diameter for tunneling is 6.28m. The stratum materials include gravelly soil, medium-coarse sand, gravel, cobble stone, etc. Slurry cycling volume is 2000m³/h. Two sets of MTP-1000 slurry treatment system and two units of APN18SL40M filter press are employed in this

  • GuangZhou Subway Line 9 Tender 1 Project

    Guangzhou subway line 9 tender 1 project is constructed by China Railway the Third Engineering Group. The diameter for tunneling is 6.28m. The stratum materials include clay bed, mucky soil, silty-fine sand, moderately weathered slate etc. Slurry cycling volume is 1000m³/h. three sets of MTP-1000 slurry treatment system and one set of ZTJ-60 are employed in this project.

  • ShenYang Subway Line 9 Tender 7 Project

    Shenyang subway line 9 tender 7 project is constructed by China Railway 12th Bureau Group Co.Limited. The diameter for tunneling is 6.28m and the length is 2.22km.The stratum material may include cobble, medium coarse sand etc. Slurry cycling volume is 1000m³/h. one set of MTP-1000 slurry treatment system, one set of ZTJ-120 slurrying and adjusting system and one

  • NanChang Subway Line 2 Tender 4 Project

    Nanchang subway line 2 tender 4 project is constructed by China Railway Tunnel Group Division 2 Limited Ltd. The diameter for tunneling is 6.28m. The stratum materials include intense-weathered slurrystone, medium-coarse sand, gravel, etc. Slurry cycling volume is 1000m³/h. Two sets of MTP-1000 slurry treatment system and one set of ZTJ-120 are employed in this project.

  • TaiShan Nuclear Power Station Tunnel Project

    Taishan nuclear power station tunnel project is constructed by China Railway Tunnel Group. The diameter for tunneling is 9.03m and the length is 8.66km.The stratum material may include silty-fine sand, granite, silty clay etc. Slurry cycling volume is 1600m³/h. One set of MTP-1600 slurry treatment system, one set of ZTJ-120 slurrying and adjusting system and

  • WuHan Subway Line 2 Tunneling Project

    Wuhan subway line 2 tunneling project is constructed by China Railway Tunnel Group. The diameter for tunneling is 6.52m and the length is 6.52km.The stratum material may include silty-fine sand, and silty clay etc. Slurry cycling volume is 1000m³/h .Two sets of MTP-1000 slurry treatment system, one set of ZTJ-120 slurrying and adjusting system and one uni

  • GuangFo Subway Project

    Guangfo subway project is constructed by China Railway NO.3 Group Co.,LTD. The diameter for tunneling is 6.28m.The stratum material may include clay bed, mucky soil, silty fine sand, sand bed, etc. Slurry cycling volume is 1000m³/h. Two sets of MTP-1000 slurry treatment system, one set of ZTJ-80 slurring plant are employed in the project.

  • ShenYang Subway Line 2 Project

    Shenyang subway line 2 project is constructed by China Railway Tunnel Group. The diameter for tunneling is 6.28m.The stratum material may include medium-coarse sand, pebble bed, Round gravel soil etc. Slurry cycling volume is 1000m³/h. One set of MTP-1000 slurry treatment system, one set of ZTJ-60 slurring plant are used in the project.